MUSC DATA CENTER

Home » Science, Technology and energy » MUSC DATA CENTER

This project replaced an existing obsolete uninterruptable power system (UPS). Engineering included a plan for construction with no interruption of power, cooling, fire protection or monitoring systems.

The project was complicated by the fact that the UPS system was located on the sixth floor of the building, the data center was on the third floor and the building was continuously occupied during construction.

The new system was designed for side A – side B redundancy and included new power distribution units (PDUs) on the data center floor.